Monday, November 25, 2013

Drywall repair and lessons learned

Hi friends! A lot has happened since I last gave a basement project update. I was actually going to write this post last night, but I was super tired and watching Once Upon a Time and eating Indian food on the couch with J was just so much more appealing.

I finally finished up the drywall downstairs. In engineering, post-project, we do something called Lessons Learned to detail all the things you did wrong and would fix in the future. This project is no exception. I'll detail what I did first and then cover what I would do differently if I were doing this project again.

So, first off, we left off last time here:


I quickly realized there was a problem on the left side. The outer-edge sloped in from the rest of the wall due to the spacer piece they had put by the edge. A 1/4" difference over 28" is no big deal so the drywall didn't look weird, but I had no span and the drywall would have definitely had a bump in it. In order to get around this issue, I decided to cut back more of the drywall. The back seam will be hidden by our upper cabinets. Of course, when I cut back there were no studs (unlike what you see in the picture). I ended up making "studs" to hang the drywall by taking 2 x 4 pieces and using my kreg jig to attach them to the support above. The studs cannot hold any real weight, but can easily support the piece of drywall.

I used my jigsaw for the drywall cuts. It made super clean cuts for me.

As you can see the new piece of drywall covers the uneven edge nicely. I used drywall screws to attach.

I used drywall tape for the seams. Looking back, I wish I hadn't because there are a few bumps in the finished product. They will mostly be covered, but they still irritate me.

Screwing in the top drywall pieces. A note of warning... ceiling work is a huge pain.


Ceiling drywall pieces in.

I used tape for the inside crease. Here, you can also see the corner bead I put in. Corner bead is used to make drywall corners. It comes in sheet metal, vinyl, and paper-backed. The metal is the least expensive, but, looking back, vinyl would have been way easier to work with. I used mostly nails to attach the corner bead. I was concerned about screws poking out.



I didn't cover this too much, but I used a piece of drywall to cover the small section over on the right side. Luckily it sat flush with the rest of the wall. I had already started spackling over the corner bead on the right side in this image.

The top piece of corner bead being installed.

To get nice smooth edges, everything takes at least 3 rounds of spackling and sanding. There are a few places I wish I had gone over a few more times, but you really just try to do the best you can. It gets super tiring after a while. I started with a 6" plastic putty knife and worked up to a 12" drywall taping knife. You will want the larger one to smooth everything over. What I learned from drywall work is don't expect perfection.


This is the point where I stopped with the spackling and sanding. I had used about a half a tub of joint compound. Also, I needed to get things cleaned up for Thanksgiving.

I used 1-2 coats of primer on everything and then used leftover paint for the outside walls. I plan on painting the inside a different color, but I won't do that prior to turkey day. Here are some finished product pictures. They seem to hide the imperfections. There are a few bumps in real life, but I can always patch things up again before I paint again (since I plan on doing so). The outside walls are done at this point.



I love the header being down. It makes the space seem so much more open. I am really glad I did it.

Lessons Learned.

1. Had I known that I was going to do this much drywall work, I would have ripped out all the drywall and put in fresh stuff at the start of the project. I would have been able to see better what was going on with the electrical and plumbing. I would have had a lot less work to get all the edges smooth. And I wouldn't have had to repair all that drywall at the start of this project. I didn't think ahead enough at the start of the project.

2. I should have taken the header down before tiling. I was having to protect the tile the entire time and it gave me less mobility.

3. I would have used the self-adhesive drywall tape. The plain drywall tape was hard for me to work with on my first project, and I would have done much better with the more expensive stuff.

4. Have I mentioned that everything takes more time than I anticipated? True story.

I hope you enjoyed and learned from my drywall experience. I would say the next post will be about the cabinets, but I don't think it's true. There are a few more steps of prep work before we get there. Plus, I don't expect the cabinets to arrive until early-mid December. Stick with me... we are almost there. :)

Thursday, November 14, 2013

Basement - Design work and more demo

Hello there!

Lots to share since I have been bad about keeping the blog up to date with where things are on the project. Last I shared, we had just finished the tile. I have now moved on to getting the rest of the bar area planned.

First, let me share my mood board with the items I have chosen for the cabinets and countertop.


Cabinets: HomeCrest Cabinets - Cambridge, Sorrel Stain with Ebony glaze
Tile: Ivory Honed and Filled Travertine, The Tile Shop
Sink Base - Moen, 16" x 16" x 8"
Faucet - Moen, Brantford Bar Faucet in ORB
Countertop - Cambria (Quartz), Newhaven

The layout for the cabinets is below (Just took a picture from my phone, sorry for quality). The sink base is 24" wide. The left base cabinet is 15" wide. All three top cabinets are 18" wide. A big thank you to Cabinet Discounters for their help with designing everything (and helping me make decisions).


While designing what we wanted for the cabinets, I realized a pretty big problem. The header of the closet (aka the part that hangs down) is too low for the wall cabinets. After much study (mostly involving figuring out where the studs and support structures were), I figured out I could take down the header. It would make the area look much more professional.

First, I took off the trim pieces around where the closet doors were.

Writing to mark the pieces of drywall.

There are a lot of pictures missing here. Mostly because I was working at all sorts of weird angles and it got frustrating. I took off the back drywall first. I marked where I wanted the drywall to be taken out and then scored the drywall in those places. This involves using a very sharp utility knife. Once the area has been scored, a few good whacks will take down the drywall.

I enlisted J's help.


After the drywall was removed, I was left with the wood used to hold the header. None of this was structurally important. It was attached via a few nails. Some nails, we were able to pry out (J helped). One we had to cut. The other way I got it down was that once the 2 vertical pieces were out, I cut the horizontal piece in half. I then had a lot of leverage to get the remaining nails out.

There were then some misalignment of the underlying structure that I had to fix. I used a 1 x 4 for the ceiling. There was some slight sloping, so I had to use a few pieces of 1 x 4 to get it right. I used screws to attach.

I also had to use a 1 x 4 on the left hand side. Since then, I had to do a bit more work over there, but I'll cover that next post.



There is still a lot of drywall work to do before the cabinets are installed. Luckily I have a few weeks to wait for the cabinets anyway, which gives me time to work on it. Ideally, you would put in the drywall in large sheets, but I am just not going to do that.

It's been kind of fun to see how everything is put together. Drywall is not my favorite, so I hope it turns out okay. I'll cover this next time, but I had to get a little creative with how to make it work. I also have yet to figure out what I will do about lighting. One step at a time.

And last but not least, before I started all this demo work, I did seal the tile.


It was not hard and took very little time. It's a matter of spreading on the sealer, waiting 10 minutes, and wiping off the excess. I did 2 coats of sealer since the travertine was so porous.

I also tucked in the carpet, but I don't have a final picture to share of that. I guess you'll have to wait until the mess is cleaned up. I used plastic and plywood to protect the tile during header demo.

Until next time...